Model Number: TE05-0509
Product Name: Thread mould
Standard: Hasco Eqv.
Cav. No. : 1 cavity
Core & Cav.: 1.2343(48-52hrc)
Mould base: S50C
Injection System: Cold runner
Raw Material : PP
Mold size: 800x500x 650mm
Weight: 920kgs
Moldlife: 500000 shots
Brand | TTM |
Mould Base | LKM, HASCO, DME, C50 standard mould base |
Mould Material | H13, 1.2344, 1.2738, P20, 45#, etc., according to customers’ requirement. |
Mould Standard | HASCO, DME, MISUMI, LKM, etc. |
Product Material | ABS, PP, PC, PA, PA66, POM, etc. |
Runner | Cold/Hot Runner |
Gate Type | Side gate, sub gate, pin point gate, edge gate, etc. |
Mould Size(min) | 150*150mm |
Mould Size(max) | 1600*1200mm |
Mould Weight | 50~15,000 kg |
Injection Machine Type | 80~1500ton |
Certification | ISO9001:2015 |
Lead Time | 3~6weeks according to the product |
Talent Mould is specialized in plastic mould, alloy mould design and manufactue, bulk production for plastic parts and alloy parts, also supply turnkey service for rapid prototyping, precision machining, surface treatment and assembly. Our products are mainly used for automotive, medical device, mechanical engineering, equipment industry, household and so on.
* Plastic injection mold with tolerances up to ±0.02mm.
* 2K/Dual-component molds
* Over Molding
* Gear Mould
* Die-Casting Mould
* Injection Molding
* Precision Machining
* Silicone Molds
* Rapid-Prototyping & 3D Printing
* Surface Treatment
* Product Assembly
It will take about 2-5 days for us to make 3D mould design , it will depend on how many sets of molds and how complexity of the mold.
If customer confirmed our 3D design, we ‘ll make 2D drawing with the BOM for our customer to check all of components steel material specification .
If the part is complexity , or the filling speed is hard to confirm, we could offer the mold analysis report to customer .
To be always able to deliver high quality mould an plastic products to our customers, the highest level of quality assurance is essential for us .
This starts with the contract review over the entire project cycle and ends with the shipping process.
We have therefore implemented a Quality Management System according to ISO 9001:2015 allowing for continuous improvement of our processes.