Foot Package Mold
Foot Package Mold
Foot Package Mold

Foot Package Mold

Model Number: TE08-0115
Product Name: Fruit Fly Trap
Brand Name: TTM
Mould Type: Plastic Injection Mould
Mould Base: S50C
Mould Material: H13
Mould Cavity: 8+8
Injection: 16pcs Yudo valve gate
Mould Life: 300,000shots
Surface: Polish #600
Plastic Parts Material: PP
Lead Time: 5weeks

Send Inquiry

Basic Information:

 Talent Mould has the tools and talent to support your products development process. We are ready to assist in your design process with a dedicated staff of engineers, with years of tooling and plastic injection mold experience.

Production Scope:

* Plastic injection mold with tolerances up to ±0.02mm.
* 2K/Dual-component molds
* Over Molding
* Gear Mould
* Die-Casting Mould
* Injection Molding
* Precision Machining

 Turnkey Service:

* Silicone Molds
* Rapid-Prototyping & 3D Printing
* Surface Treatment
* Product Assembly

uploaded image

3D Design

It will take about 2-5 days for us to make 3D mould design , it will depend on how many sets of molds and how complexity of the mold.
If customer confirmed our 3D design, we ‘ll make 2D drawing with the BOM for our customer to check all of components steel material specification .
If the part is complexity , or the filling speed is hard to confirm, we could offer the mold analysis report to customer .

uploaded image

uploaded image

About your project:

Please kindly send me drawing files in step/igs/x-t format or photos which will include clear hanger structure and dimension with below information,We can sign NDA to protect your copyright.

Our project manager having the following tasks / responsibilities:
● Project planning, reporting, change management and customer-interface organize and manage design & production reviews, try-outs with delivery of samples , final approval and mould delivery.
● Progress and status reports are issued each week including photos.
● Communication is done in English with marketing dept.

Quality Management

To be always able to deliver high quality mould an plastic products to our customers, the highest level of quality assurance is essential for us .
This starts with the contract review over the entire project cycle and ends with the shipping process.
We have therefore implemented a Quality Management System according to ISO 9001:2015 allowing for continuous improvement of our processes.

uploaded image

uploaded image

Inquiry